INSTALLATION OF 80kVA ONLINE UPS AT North West University

80kva ups integrated with seperate charge controller and solar panels to power 2 elevators for 11 floor building

INSTALLATION OF 80kVA ONLINE UPS AT North West University
North West University (Gidan Ado Bayero City Campus)
Kano, Nigeria
2022
Electrical

Load study

UPS installation

Distribution

Commissioning

80 kVA

UPS Capacity

City Campus

Campus

Protected

Critical Uptime

The challenge

The facility suffered from frequent grid outages and high diesel generator operating costs, leading to high operational expenditure and unpredictable business downtime.

Our approach

  1. 1

    Conducted an extensive site energy audit and load study.

"The new hybrid solar infrastructure has cut our operational energy expenses by 65% while providing complete power reliability across our entire hub."

On site

From the project.

Photography from the installation, commissioning and handover.